The 49th hole of an on-going drilling program on gold property in Vauquelin Twp. in the Val d’Or, Que., area was recently completed, Vauquelin Mines reports.
Among the better results to date are the following:
Width Grade Hole (ft) (oz/t) NR-87-22 9.2 0.52 W-87-06 4.3 0.3 W-87-10 2 0.28 W-87-13 2.8 0.21 W-87-19 6.6 0.37 W-87-20 14.5 0.46 W-87-21 6.9 0.38
The company says mineralized zones of both the Nordeau and West blocks, which are undergoing the current drilling, are still open laterally and towards depth.
Be the first to comment on "Vauquelin completes 49th drilling hole"