A recent drilling program, designed to follow-up a zinc discovery made earlier this year at the Pick Lake project near Schreiber Ont.,hit the high-grade zinc mineralization in four of eight holes. The results of Minnova’s (TSE) 7,000-metre drilling program included a 3.6-metre section grading 34.3% zinc, 1.2% copper, and 56.9 grams silver per tonne in hole 67C and a 3.5-metre section grading 17.8% zinc, 0.71% copper, and 59.5 grams silver in hole 32A.
Be the first to comment on "Minnova completes follow-up at Pick"