The scale of the project, even by today’s standards, was impressive. In original estimates, close to $300 million was needed to bring the iron ore deposits to economic production; large- scale port facilities were required at Sept-Iles, on the St. Lawrence, and a railway 350 miles in length had to be built to link the mine with the port, through difficult terrain.
]]>
Be the first to comment on "Jules R. Timmins, 1889-1971"