The first hole drilled by Noble Peak Resources (NPK-A) at the Worcester gold project in South Africa’s Barberton greenstone belt has intersected gold mineralization.
The hole returned 0.31 metre grading 2.8 grams gold per tonne, 4 metres of 1.01 gram, 2.5 metres of 0.66 gram, and 4.63 metres of 0.53 gram.
Results from several other holes that tested the past-producing project are awaited.
Be the first to comment on "EXPLORATION ROUNDUP — Noble Peak hits gold at Worcester"