FREE ARTICLE PREVIEW: You are enjoying a free sample of exclusive
subscriber content. There is a limit of three free articles per week.

DAILY NEWS Nov 14, 2012 5:17 PM - 0 comments

Record production for SAS

TEXT SIZE bigger text smaller text
2012-11-14

St Andrews Goldfields (SAS-T) goal of reaching 100,000 oz. of gold production for the year is getting closer to reality.

Production for the third quarter came in at a record 25,742 oz. which SAS’s CEO Jacques Perron says keeps it on track to meet its production guidance of 90,000 to 100,000 oz. for the year.

Cash costs from its three producing mines in the Timmins mine camp came in at US$768 per oz. bringing year-to-date, total cash costs down to $933 per oz. compared to US$1,165 for the same period last year.

Such metrics were good enough to generate a positive, although modest, net income of $6.3 million or 2¢ per share.

The record production came largely on the back of its Holt Mine, which led the way with 13,145 oz. of gold produced at cash costs of US$708 per oz. The mine did experience slightly higher costs than expected after an ore pass between two levels of the underground operation became in-operable. But SAS’s VP of operations, Duncan Middlemiss, said on a conference call that the problem would be rectified by the end of the year.

At its Holloway mine, production came in at 5,408 oz. of gold at cash costs of US$746 per oz., while the Hislop mine produced 7,189 oz. at cash costs of US$889 per oz.

SAS is also getting closer to bringing a fourth mine into production as excavation of a bulk sample at the Taylor project got underway. The plan is to process 15,000 tonnes of ore from the upper lens of the West Porphyry zone in order to validate its geological model, mining method and mill recovery rates.

Stope access and development for the sample were completed in the quarter, and ore from the site will be processed at the Holt mill. SAS plans to spend a total of $6 million at Taylor this year, but Middlemiss said cash generated from the sample will offset part of the project’s capital costs.

The company ended the quarter with $20.7 million in cash and has access to another $10 million line of credit. That means it is in good shape to finance Taylor all the way into production while pursuing an aggressive exploration program.

With regards to exploration, the drills were focused on the Ghost and Zone 4 targets by Holt and Hislop North. A total of 13,000 metres were drilled bringing the year-to-date total to 40,000 metres. The company currently has four surface rigs turning, two of which are drilling the Hislop North target.

SAS will use Zone 4 exploration results to plan for drifts so that it can do more drilling next year.



© 1915 - 2014 The Northern Miner. All Rights Reserved.

Related News
Mt. Milligan produces first concentrate
Northern Gold's great expectations
Northern Gold takes it small to go big
Related Press Releases
SAS reports solid 2014 second quarter results and raises production guidance
SAS reports Q2 2014 production results of 22,505 ounces of gold and provides notice of earnings release and conference call
SAS Provides an Exploration Update for the Smoke Deep Zone at the Holloway Mine
 

Companies in This Story

St Andrew Goldfields Ltd

Properties in This Story

Timmins Hislop Property



Horizontal ruler
Horizontal Ruler

Post A Comment

Disclaimer
Note: By submitting your comments you acknowledge that Northern Miner has the right to reproduce, broadcast and publicize those comments or any part thereof in any manner whatsoever. Please note that due to the volume of e-mails we receive, not all comments will be published and those that are published will not be edited. However, all will be carefully read, considered and appreciated.

Your Name (this will appear with your post) *

Email Address (will not be published) *

Comments *



* mandatory fields