FREE ARTICLE PREVIEW: You are enjoying a free sample of exclusive
subscriber content. There is a limit of three free articles per week.

TABLE OF CONTENTS Jun 26 - Jul 2, 1995 Volume 81 Number 17 - 0 comments

El Callao outlines gold zone in Venezuela

TEXT SIZE bigger text smaller text
VANCOUVER 1995-06-26
Drilling on the Venezuelan property known as Lo Increible is outlining a second zone of gold mineralization for El Callao Mining (VSE).

The company, which is earning up to a 70% interest in the property, reports that drilling has traced the Cruz zone over a strike length of 750 ft. It remains open to the southwest, as well as at depth.

The company expects to release further results as they become available.

Recent results include: 71.2 ft. grading 0.18 oz. gold per ton in hole 95-95; 7.2 ft. grading 0.38 oz. plus 9.8 ft. grading 0.18 oz. in 95-97; and 3.3 ft. grading 0.29 oz. in 95-98.

Drilling on the zone last year returned a 15-ft. intersection grading 0.28 oz. plus a 10-ft. intersection grading 0.39 oz. in hole 94-30, and a 60-ft. intersection grading 0.19 oz. in 94-42.

Meanwhile, El Callao plans to start mining on the nearby La Victoria deposit upon receipt of the necessary permits.

The operating plan calls for mining of 8,000 tons per month at an average grade of 0.28 oz. gold, to produce an estimated 26,000 oz. per year. The ore will be milled, under a year-long contract, at Monarch Resources' nearby operation.

Based on a gold price of US$390 per oz., El Callao expects the project to generate monthly cash flow of about $350,000. The revenue will be used to fund ongoing exploration and feasibility work.

Resource estimates for La Victoria have yet to be released, although a large deposit is indicated by drilling carried out over an area measuring 1,650 ft. in length, 100 ft. in width and 700 ft. in depth. Feasibility work will begin shortly.

To define the size of the deposit and upgrade the reserve, El Callao plans to carry out diamond drilling beginning in September.



© 1915 - 2014 The Northern Miner. All Rights Reserved.

Related News
Hecla advances Don Sergio
Meetings (May 26, 2003)
Meetings (May 19, 2003)


Monitor These Topics
More Topics »

Horizontal ruler
Horizontal Ruler

Post A Comment

Disclaimer
Note: By submitting your comments you acknowledge that Northern Miner has the right to reproduce, broadcast and publicize those comments or any part thereof in any manner whatsoever. Please note that due to the volume of e-mails we receive, not all comments will be published and those that are published will not be edited. However, all will be carefully read, considered and appreciated.

Your Name (this will appear with your post) *

Email Address (will not be published) *

Comments *



* mandatory fields